Discover modern living at its finest in these stylish townhouses, Horizon Platinum Residence, located in Choeng Mon, Koh Samui. These thoughtfully designed properties offer the perfect blend of comfort and convenience, featuring dedicated off-road parking along with ample guest parking.
Access your home through an advanced electronic key card security system, leading into a spacious open-plan downstairs area. Bathed in natural light from large sliding glass windows, the living room seamlessly connects to a stylish dining area and a fully fitted Western kitchen, complete with a breakfast bar. A convenient guest W/C and a rear door that opens to a quaint garden area enhance the downstairs layout.
Ascend the staircase, conveniently located opposite the front door, to discover an inviting upper level. This space includes two generously sized double bedrooms at the rear, sharing a well-appointed bathroom. An office area provides the perfect spot for work or study, while the master bedroom, located at the front, boasts an en-suite bathroom. Townhouses 1 – 6 also benefit from a dressing area, and a private balcony—perfect for morning coffee or evening relaxation.
Thai freehold and Leasehold ownership options are available.
Horizon Platinum Residence is a secure gated community offering 24-hour security and full management services. Residents enjoy access to a fully equipped gym and two refreshing swimming pools. Additional conveniences include maid services and a tuk-tuk service for easy beach access.
Just a four-minute stroll from the stunning Choeng Mon beach, and minutes from the airport, restaurants, bars, shopping areas, and the vibrant nightlife of Chaweng beach and Fisherman’s Village, this property combines luxury living with an unbeatable location. Embrace the ideal lifestyle at Horizon Platinum Residence!
Units 1 – 6 = 192.38 Sqm’s including 157.18 Sqm’s of internal space
Units 7 – 10 = 199.4 Sqm’s including 170.23 Sqm’s of internal space
Land plots range from 126.8 Sqm’s – 198.4 Sqm’s with an average size of 146.3 Sqm’s.
Construction timeline:
Start on the 1st April 2025, complete on or before the 1st August 2026